top of page
3.JPG

SMA Depo Alanı

Place

Kocaeli, Şekerpınar

Type of Business

Üretim Tesisi

Total Construction Area

5650 m2

Total Structural Steel

250 Ton

Excavation, reinforced concrete construction, insulation, steel construction, sandwich facade panels, electrical-mechanical infrastructure installation, administrative building system curtain wall works and finally building construction has been done.

bottom of page