top of page
Bolartcph002.png

Baskı Devre Üretim Tesisi / Depo Projesi

Place

Gebze / Şekerpınar

Type of Business

Fore Kazık
Anahtar Teslim İnşaat

Total Construction Area

5.300 m2

Total Construction Area

260 Ton

Total Construction Area

229 Adet

As a result of the demolition of a certain part of the existing Sheraton hotel structure, the reinforced concrete rough constructions of additional buildings, parking garage areas, pools, villas and the residence section were completed.

bottom of page