top of page
22.06_19 - Foto 2.jpg

Naya / Depo Projesi

Place

Gebze / Şekerpınar

Type of Business

Anahtar Teslim Depo Projesi

Total Construction Area

2.000 m2

-

As a result of the demolition of a certain part of the existing Sheraton hotel structure, the reinforced concrete rough constructions of additional buildings, parking garage areas, pools, villas and the residence section were completed.

bottom of page