top of page
akkmya003.jpg

Akkim

Place

Serbest Bölge

Type of Business

ÜRETİM TESİSİ VE İDARİ BİNA PROJESİ

Total Construction Area

4200 m2

Total Construction Area

300 Ton

As a result of the demolition of a certain part of the existing Sheraton hotel structure, the reinforced concrete rough constructions of additional buildings, parking garage areas, pools, villas and the residence section were completed.

bottom of page