top of page
Akkim
Place
Serbest Bölge
Type of Business
ÜRETİM TESİSİ VE İDARİ BİNA PROJESİ
Total Construction Area
4200 m2
Total Construction Area
300 Ton
As a result of the demolition of a certain part of the existing Sheraton hotel structure, the reinforced concrete rough constructions of additional buildings, parking garage areas, pools, villas and the residence section were completed.
bottom of page